Projects of houses with a boiler room and two bathrooms. Projects of houses with a boiler room. Houses with a boiler room from the company "Dachny Season"

Projects of houses with a boiler room and two bathrooms.  Projects of houses with a boiler room.  Houses with a boiler room from the company
Projects of houses with a boiler room and two bathrooms. Projects of houses with a boiler room. Houses with a boiler room from the company "Dachny Season"

Wooden house-building, thanks to the development of wood processing technology, which gives this material additional design capabilities, currently occupies a large share in the field of private house-building. Wood is not only the most environmentally friendly material, it retains heat perfectly and maintains a healthy microclimate in the house. A house built by North Forest from or is perfect for permanent residence.
For year-round living in a wooden house, it is necessary to equip it with a reliable heating system. It is more convenient to allocate a separate room to accommodate the heating boiler, its piping system, and water treatment system. Therefore, for permanent residence they usually order a house with a boiler room from us. And if you plan to have gas heating, then the boiler room in the house must meet fire safety requirements for: room size, glazing size, ventilation system, separate exit to the street, etc. Projects of wooden houses with a boiler room created by our specialists, comply with SNiP requirements and other regulatory documents. Each project is carefully thought out: from the elaboration of layouts and facades to the arrangement of furniture. Almost all house projects presented on our website have a boiler room. At the customer's request, we will change the layout free of charge.

Features of houses with a boiler room

  • 1. If possible, the boiler room is located next to the kitchen, where the gas stove is installed. This allows you to make only one gas pipe entry into the house. For the convenience of laying utility networks, they try to locate bathrooms as close as possible to the boiler room.
  • 2. Even if, according to fire safety requirements, the boiler room has access to the street, very often a door to the boiler room is made from the house. This way you can get into the boiler room without going outside. Boiler maintenance, filter replacement, and setting a comfortable air temperature become much more convenient.
  • 3. In small houses, in addition to equipment, a washing machine and a clothes dryer are installed in the boiler room.
  • 4. The location of the boiler room inside the house is much more economical and convenient than in the basement. Fire safety requirements for placing a boiler room in the basement are more stringent than in a house.

If you liked the design of a small house without a boiler room, we will finalize this project and design a boiler room in the house that meets all fire standards. The North Forest company has been building wooden houses for more than 15 years. We have designed and built almost

The Russian Postroechka company manufactures and inexpensively erects turnkey houses made of timber with a boiler room in the Central and North-Western regions of the Russian Federation. These are functional and practical one- and two-story buildings made of environmentally friendly, natural material. The presented catalog contains 4 projects of houses with a boiler room.

Typical projects, implemented more than once in practice, allow you to accurately calculate construction costs and quickly obtain a finished result. If necessary, minor adjustments can be made to the finished project to adapt it to the individual requirements of the customer.

We offer our clients to buy a house made of timber with natural humidity (for shrinkage) or kiln drying. In the first case, you can additionally save up to 20% of the cost of the house; in the second, you can build a house that is immediately ready for use. We have our own woodworking production, so the price of the material is affordable for most people.

Profiled timber is delivered directly to the construction site. The form of payment is convenient for clients: 70% of the total price is paid after delivery of the material, 30% upon completion of construction work and commissioning of the facility.

Advantages of houses with a boiler room

Projects of houses made of timber with a boiler room are chosen by those customers who value useful space and want to use it as rationally as possible. Building a house with a boiler room has a number of advantages.

  1. The price of such a multifunctional building is much lower than the cost of building a house and a boiler room separately.
  2. Servicing boiler room equipment, especially in the winter, is easier and simpler if the room is adjacent directly to the residential block.
  3. Due to the ergonomic design of the building, it is possible to free up space in the local area and use it for other purposes.

The company "Russian Construction" has been on the domestic market for more than 5 years. Our clients trust us, and we guarantee the quality of both materials and construction work. You can get advice and additional information about cooperation from our specialists by calling our toll-free number. We are ready to start construction without delay!

In a country with such a harsh climate as Russia, high-quality heating of private residential buildings is a matter of not only comfort, but also safety. This is why most people who decide to move from an apartment to a private house take the issue of heat supply very seriously.

Option for planning a house with a boiler room

Of course, at the planning stage they are most interested in house designs with a boiler room. The boiler room provided for during the design usually meets a number of requirements placed on it by specialists and ordinary users. And every person who orders a project for their future home from a specialized company needs to know about them. In addition, you need to know what stages you will have to go through when designing a house with a boiler room.

It is especially difficult to comply with all the standards if you order a project for a small one-story house with a boiler room. Since in this case it is necessary to comply with safety requirements and not take up too much space, otherwise the area of ​​other rooms in the cottage will be reduced.

Today, in order to install a heating boiler in your private home, you will have to go through a number of not so simple procedures, both technical and legal.


Installation diagram of a heating installation in a two-story house

Of course, starting work without knowing about them is simply reckless and even stupid. So, what stages is it customary to divide all the work into?


In most cases, completing all these steps is enough to enable you to install all the necessary heating equipment in your new home.

Where is the best place to locate the boiler room?

A heating boiler, even if all required safety rules are observed, is a source of increased fire hazard. Therefore, you should approach the choice of the place where it will be installed very responsibly and seriously. It is necessary to consider not only the cost of placement and operational safety, but also ease of use. Based on this, there are three main ways to locate a boiler room.

The first is out-of-home placement. It should be said right away that this method is as expensive as it is safe.

Of course, on the one hand, placing the heating boiler 5-10 meters from the house ensures that in the event of a gas or diesel leak or an accidental fire of solid fuel, nothing will threaten your home.

But keep in mind that you will have to develop a separate drawing, pour an additional foundation, think about installing external utility networks and their thermal insulation.


pouring the foundations for the boiler room

You will have to spend a lot of money and time. And the ease of use is significantly reduced.
Secondly, if the designs of houses with a boiler room were initially developed taking into account the installation of the necessary equipment, then the heating boiler can be located on the ground floor or even in the basement. Most people prefer to place it in the basement. Then you won’t have to allocate 15-16 square meters of usable space on the ground floor, which means that the freed up space can be used to greater advantage.

To install a diesel boiler or solid fuel boiler, it is necessary to provide a separate room: when coal, wood, peat or diesel fuel is burned, a large amount of smoke is released, which can cause certain problems for the inhabitants of the house. Well, even the most economical owner can allocate 15 square meters when building luxurious two-story houses with a boiler room.


Plan of a two-story house with a boiler room

If you prefer an electric heating boiler or a not too powerful (no more than 30 kW) gas boiler, then you can install the equipment in the kitchen. Modern equipment is small in size, so it is not noticeable and does not take up extra space. If desired, you can even choose special wall-mounted boilers that take up virtually no useful space in the room.

Of course, the kitchen must have high-quality ventilation, and simply monitoring the condition of the equipment will never be superfluous.

After all, the slightest gas leak is enough to destroy an entire house, along with the people living in it.

And finally, an option that allows you to combine the advantages of the two described above and at the same time, partially get rid of their disadvantages. When designing wooden houses with a boiler room, you need to provide a small extension in advance.


Project of a wooden house with a boiler room

A foundation is also poured under it, which is part of the main foundation. In most cases, extensions are made from lightweight materials (frame construction), which allows you to save a considerable amount during construction. This simplifies the organization of high-quality ventilation. As a result, you get a boiler room, which is located in close proximity to the house. Thanks to this, you will not have to spend extra money on laying the pipeline.

At any time you can enter the extension both from the side of the house and from the street: in most cases, extensions are equipped with two doors. If a gas leak (carbon monoxide or explosive) occurs, the risk of serious damage to the main building is minimized. Therefore, an extension to the house dedicated to the boiler room can be called the optimal solution.

Additional requirements for the boiler room

Regardless of where you decide to install the heating boiler - in the house, in an extension or a separate building, the room must meet certain requirements. Moreover, the requirements are also different for different types of boilers.

For example, if you are building a frame house with a gas boiler room, then the area of ​​the boiler room must be at least 15 meters with a height of 2.2 meters. However, this only applies to heating boilers with a power of no more than 30 kW. If you are using a boiler with a power of 30 to 150 kW, then the ceiling height should be at least 2.5 meters. Also note that you cannot store a gas tank (whether cylinders or another container) in the same room as the boiler, in order to avoid fire and a terrible explosion.

For boiler rooms with solid fuel boilers, the area can be reduced to 7 square meters, and you can choose the height that seems sufficient to you.

If you are using a wall-mounted boiler, make sure that the boiler room layout includes one wall built of non-combustible material (brick or concrete). When choosing a heavier floor-standing boiler, make sure that the boiler room foundation can withstand such a significant load. Of course, the floor must have a completely non-flammable coating. When creating a heating system in an extension or outdoors, it would be better to fill the floor with concrete. If you are installing the boiler indoors, it will be enough to lay a steel sheet of sufficient thickness on the floor.

You should not skimp on components. Yes, by buying high-quality smoke detectors, bypasses, shut-off valves and other equipment in a specialized store rather than on the market, you will spend several hundred or even thousands of rubles more. However, in this case, you will be sure that each part is made of high-quality materials, and not brittle alloys that cannot withstand significant pressure and frequent temperature changes.


Connection diagram for a solid fuel boiler in a boiler room

This means you guarantee the safety of yourself, your loved ones and your property. Isn't it worth the extra thousand rubles spent? In some cases, it is necessary to connect a sewer drain to the boiler room. Condensate that, under certain circumstances, occurs in the chimney of the heating boiler will flow there.

In general, the layout of a house with a boiler room consists of many calculations, complicated by the fact that every little detail must be taken into account.

After all, it is important not only to correctly calculate the power of the installed boiler, but also to select suitable equipment based on the size of the premises, the thickness of the walls, the area of ​​windows, the strength and direction of the wind in a given region, and the temperature (average in winter and extremely low). Therefore, most people prefer not to even try to draw up a plan on their own, entrusting this extremely complex and responsible work to specialists.

Yes, because of this, the already expensive operation of installing a heating boiler turns into the most expensive of all installation procedures for engineering systems. But you can be sure that nothing threatens your family and you personally. And that even on the coldest winter days, when a blizzard howls outside the window, you will be warm and feel really comfortable.

In the presented catalog you will find projects of houses made of timber with a boiler room from the construction company "Eco Stroy". In this catalog you will find projects of various sizes and configurations. The area of ​​buildings is selected from 60 to 170 square meters. The price varies from 300 to 700 thousand rubles.

Each cottage is complemented by some architectural elements that give the home additional comfort. The following elements serve as such elements:

  • A two-story or one-story bay window, made in a rectangular or round shape, quite well increases the interior space of residential premises. And if you install an interfloor staircase in a bay window, you will get a lot of usable space in the room where it is usually installed.
  • On the spacious terrace it is possible to install a dining table for meals. It will also be a great place for your children to spend time playing in the fresh air.
  • On the balcony, designed on the top floor, you can sunbathe with a sun lounger or simply admire the beauty of nature.
  • In the attached parking you can park your car and protect it from inclement weather or the scorching rays of the sun.

Description of projects

Houses made of timber with a boiler room can easily warm you in the most severe winter. Thanks to the boiler room, you have independent heating at your disposal, with which you can regulate the temperature of the internal space. In addition, you will have uninterrupted hot water.

In addition to the boiler room, the cottages have main and additional rooms. The main rooms include a kitchen, a dining room or living room (a combined kitchen with a dining room is possible), a bedroom and a bathroom. And the auxiliary ones are a room for children, an office for working at home, a dressing room for clothes, a pantry for storing tools and other various rooms.

Choose and order a house project made of timber with a boiler room that will fully satisfy your requirements. To order, just call us by phone. Call right now, our specialists will implement a project of any complexity in the shortest possible time and in the highest quality.

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the Customer's family, and a solution was proposed to move the terrace.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-grill foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order, with one-sided lamination, installation on site.
    roof: metal tiles.
    external finishing: the walls are insulated with basalt facade insulation and plastered, finishing elements are made of wood, manufactured locally, based on technical specifications visualization, painted. The base is lined with decorative stone.
    interior finishing: finishing was carried out according to the design project, where the combination of decorative plaster with stone and wood was taken as the basis. False beams were installed on the ceilings.
    additionally: a fireplace has been installed and finished.

    What was done

    This is the very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with a ready-made Project for his future home! Our team liked the project - after all, such unusual and stylish solutions are always a professional challenge!
    We prepared estimates for Ilya and developed unique design solutions - all this allowed us to implement this project! The frame house is made using our proven Canadian technology with 200 mm insulation along the entire contour! The outside of the house is sheathed with imitation timber. All windows are custom-made and laminated in colors according to the project. Additional accents are placed thanks to professional painting of imitation timber and selection of paints.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge, building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory ones - an existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family, this was precisely the difficult task. They had a foundation from an old burnt house, and a landscaped area around it! The new house had to be built in a short time on the existing foundation. Dmitry and his family had a desire to build a new house in the high-tech style. After careful measurements, a design was made that took into account the old layout, but had a new modern form with interesting innovations! The house now has an entrance area where you can sit at a table on cozy evenings and a complex but possible in our area exploitable roof. To implement such a roof, we called upon our knowledge and modern building materials, LVL beams, fused roofing and much more. Now in the summer you can have an unusual dinner on such a roof or watch the stars at night! In the decoration, our architect also emphasized the minimalistic and graphic high-tech style. Smooth plastered walls with painted plank details, and wooden beams at the entrance added personality. The inside of the house is decorated with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the site created the desired effect of illumination and airiness of the space! The house of the Matsuev family has graced our photo gallery in the section of country architecture in the high-tech style, a style chosen by brave Customers with excellent taste.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home for living that will fit perfectly into their difficult narrow plot! With the advent of children, it was decided to make the dream come true; children grow up quickly and in their own home in nature there are many opportunities and fresh air. We, in turn, were glad to work on an individual project for a house in a classic style made of red brick with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our existing construction site: evaluate the order and construction processes, storage of materials on site, get acquainted with the construction team, and make sure the quality of the work. After visiting the site, Olga decided to work with us! And we were glad to do our favorite job again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    floors: basement - reinforced concrete floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, masonry with mortar??? Windows have been installed.
    roof: metal tile
    terrace: rough fencing elements have been completed, flooring has been installed.

    What was done

    Dmitry contacted our company with an interesting preliminary design to calculate the cost. Our experience allows us to perform such calculations based on preliminary designs with minimal errors, no more than 2%. Having visited our construction sites and received the cost of construction, Dmitry chose us from many of our colleagues in the workshop to complete the project. Our team began to carry out a complex and expressive country project with spacious premises and a garage, large windows and complex architecture. After the project was completed, Dmitry chose us as a contractor company, and we, in turn, wanted to do further work at the same high level! Since the object is large, Dmitry proposed stage-by-stage cooperation, namely, upon successful completion of the foundation work, we began the second part of the project - walls + floors + roofing. Also, the exact timing of construction was important for Dmitry; in order to speed up the construction processes, the team was reinforced by 2 experienced masons.
    The box on a pile-grillage foundation was delivered right on time! The result pleased us and the Customer. All stages of the work were coordinated and worked out for Dmitry and his individual project, which benefited all participants in the process!

    What was done

    Project: The project of our company Inkerman was changed taking into account the wishes of the Customer’s family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect’s calculations, the house was built on a reinforced pile-grillage foundation.
    ceilings: wooden on wooden beams, in places of large spans installation of LVL beams. The basement floor is insulated with 200mm basalt insulation; interfloor ceiling with 150mm sound insulation.
    box: box: walls made of expanded clay concrete blocks, masonry with mortar. Windows have been installed.
    roofing: installation of metal tiles.
    external finishing: the facade is insulated with 100 mm basalt facade slabs, the facades are covered with facing bricks; the color scheme was proposed by the architect and agreed with the Customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family to live in!
    Olga and other family members went from idea to implementation in several stages! Choosing a technology, working on a project for a long time, building a foundation, building a house with exterior finishing and then working on interior decoration! Frame technology was chosen as energy-saving, prefabricated and high-tech! Why did the Krutovs choose our company? They were pleased with the quality of work on our construction site and the workers who gave us a detailed tour! We also spent a long time working on the estimate, combining different finishing options and comparing their costs. This made it possible to choose the best option from a wide variety of finishing materials and configurations.
    The project was created by an architect friend, but we had to work out the constructive part of it. After which the most reliable and effective foundation was erected - USHP. Next, work began on the box. A frame house with 200 mm insulation along the entire contour and a unique roof insulation technology of 300 mm. For the exterior decoration, siding was chosen in a spectacular combination of colors - coffee and cream. Accents are placed thanks to powerful roof overhangs, an interfloor belt and large windows!

    What was done

    When you decide to become the happy owner of your own home and move to a new home for permanent residence, first of all you think about what the house will be like; what to build it from; how much will it cost and most importantly, WHO will do all this?
    Alexander came to our company with the desire to move to his own country house. He liked the Avignon project and there was already a strip foundation on the site. After the initial visit to the site, measurements and inspection of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change the project and adapt it to the size of the existing foundation! After agreeing on the cost, it was decided to build in winter. Alexander received a gift of reinforced concrete floors, one of the leading construction teams and a house according to the design he liked, which stood on a plot with exterior finishing by spring! Alexander observed every stage of construction, regularly visiting the construction site and was pleased with the result, and we were pleased with our work. This is an individually designed Avignon project, implemented in stone technology with external insulation and siding finishing!

    What was done

    Each house is a separate story of creation and implementation! One day we built a house for good people and they recommended us to another good person! Andrey Rumyantsev came to our company with the desire to build a one-story spacious country house with a fireplace for warm family evenings on the site of an old country house... It was decided to build the house from aerated concrete blocks so that the future handsome country man would delight the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to detailed visualization of the project, each element of the exterior decoration is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and thorough. Without a doubt, such a tandem - aerated concrete and brick - can easily be called the best solution in the field of stone housing construction - warm, affordable, beautiful, reliable. Modern technologies have advanced so much that such unique configurations become available in a short time, because we built this project over the winter months. The main thing is to have the necessary knowledge and constantly replenish it!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer’s family; a terrace and patio were proposed, taking into account the cardinal directions on the Customer’s site.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-and-grid foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - wooden on beams with a 150 mm sound insulation device.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order with one-sided lamination, installation on site.
    roof: metal tiles.
    Exterior finishing: the walls are insulated with basalt facade insulation and plastered. Based on the visualization, facade panels under the Tolento stone were added. The enclosing elements of the terrace and balcony are made of wood, made locally, based on technical specifications visualization, and painted. The roof overhangs are lined with soffits matching the color of the roof.

    Vladimir Murashkin,

    The owner of a house “brought to life according to his idea and sketch!”

    House parameters:

    What was done

    When Customers come to us with bright, modern ideas for their future home, we become doubly excited! After all, working on a new stylish project is always interesting and a challenge, how to implement all the bold ideas from a constructive point of view, what materials to use? Vladimir bought a plot of land with picturesque views of the Oka bank! This view could not be ignored, so a dizzying terrace (51.1 m2) and a large balcony, oriented towards beauty, became an indispensable attribute of the future house! Vladimir wanted to relax in nature in a wooden house, but it was necessary to build a house in a short time, and frame construction technology became the ideal solution for such problems! If we’re going to be different, it’s in everything! The house was made even more spectacular by the vertical finishing of imitation timber made of durable larch, painted in natural shades with emphasized wood texture. Laminated windows complement the modern look of the house! It turned out to be an excellent country house, with highlights and at the same time incredibly functional.

    It all started with an individual project found by the Customer’s family on a European website. It was with him that she came to our office for the first time. We made preliminary calculations for the project, took a tour of the existing construction site, shook hands and work began to boil! The architect improved and adapted the project to the site and the Client’s family; the foreman “planted” the house on the site. Based on geological surveys, it was decided to place the house on bored piles. The frame grew in a few weeks, then the roofing, insulation, exterior finishing! Over the winter, a house grew on the site. The customer invited a third-party technical supervisor who monitored the process independently of our multi-stage control. The color for painting the imitation timber was selected by our manager and here in front of us is the bright and cozy country house of the Pushkov family’s dreams!