Certificate of commissioning of equipment. Certificate of acceptance of automatic fire alarm installation Certificate of work performed on fire alarm maintenance

Certificate of commissioning of equipment. Certificate of acceptance of automatic fire alarm installation Certificate of work performed on fire alarm maintenance

EXAMPLE OF EXECUTION OF AN ACT ON ACCEPTANCE OF A FIRE ALARM INSTALLATION

Installation acceptance certificate automatic system fire alarm and smoke removal control at the facility: St. Petersburg, apt. 65 HRC, box 41 in operation

Working commission appointed by the General Director

Members of the representative commission:

Conducted an inspection of the work performed and established:

1. The installation and commissioning organization AOZT NTF "EVIR" presented for acceptance the fire alarm and smoke removal control installation PP KP0119-2160-1, consisting of:

installed in a residential building at the address: St. Petersburg, block 65 SCh, kor. 41 according to project No. 12217.41/kor APP, developed by JSC LENNIIPROEKT.

2. Installation work was carried out by JSC NTF “EVIR” (licenses: UGPS GUVD of St. Petersburg and Leningrad region No. 000737 dated April 16, 1998, Administration of St. Petersburg GC No. 78-07639 dated 10/09/98) from March 10 to June 9, 2000.

Estimated cost installation work 7257 rub. in 1984 prices. The actual cost of installation work is 173,152 rubles.

4. Insulation resistance measurement results: normal.

5. Defects and deficiencies identified during the comprehensive inspection have been eliminated (if necessary, indicate in the appendix to this act).

Commission conclusion:

Technical means of fire alarm and smoke removal control that have undergone comprehensive testing, including commissioning, shall be considered accepted for operation since “___”_____________200__.

In this case, the contractor AOZT NTF "EVIR" undertakes to fulfill warranty repair alarms for twelve months subject to customer compliance current rules operation. The customer is obliged to use the alarm in strict accordance with the instructions, and if a malfunction is detected, immediately notify JSC NTF “EVIR”.

List of documentation attached to the act.

1. Certificate of completion of installation work.

2. Certificate of completion of commissioning works.

3. The act of measuring the insulation resistance of electrical wiring.

4. Certificate of execution input control.

5. Inspection report hidden work.

6. List of installed instruments and devices.

7. Copies of equipment certificates.

8. Copies of licenses.

Chairman of the commission ___________________________________/ Kuznetsova Yu. N.

Members of the commission: _____________________________________________/ Portnov D.V.

"_____"___________ 20___

Commission consisting of representatives:
Customer - "___________"
Installation organization: "____________"
Faculty of Federal State Unitary Enterprise "Security" of the Ministry of Internal Affairs of the Russian Federation "____________"
GU OVO at the Department of Internal Affairs "____________"

I have drawn up this act as follows:

In accordance with the project 22-04-08 OS, security and alarm system. Inspection and technical tests on site established:

Instruments installed at the facility

The work was carried out in accordance with current rules And technical specifications there are no deviations from the specified project

Specifications electrical circuits trains: certificate attached

Results of the stability of operation (technological run) of the TSO complex together with the monitoring station:___________________________________________

Based on the above, the security and alarm system has been put into operation since " "_____________ 2008. In this case, the contractor "____________" undertakes to carry out warranty repairs of the OS equipment within 12 months from the date of acceptance, subject to the current operating rules.

Representatives:
Customer: ______________
Contractor:_______________
FSUE "Security" ___________
GU OVO under the Department of Internal Affairs _____________

ACT on completion of installation work

"_____"___________ 20___

Working
Customer - "___________"
installation organization - "___________"
commissioning organization "____________"

Installed:

The installation organization presented for acceptance a completed security and alarm system installed in the bank branch at the address “____________” according to project 22-04-08 OS. Installation work was completed satisfactorily. Work began on May 12, 2008. Work was completed on June 9, 2008.

Conclusion of the working commission:

The installation work of the presented installation was carried out in accordance with the inspection report, standards, norms and rules. The installation presented for acceptance shall be considered accepted from June 10, 2008 for commissioning works with an assessment of the quality of installation work: satisfactory.

Representatives
customer ____________________
installation organization _________
commissioning organization __________________

Certificate of completion of commissioning works

"_____"___________ 20___

Commission consisting of representatives:
Customer - "___________"
Commissioning organization "____________"
established that from June 9, 2008 to June 10, 2008, FSUE Okhrana carried out commissioning work burglar alarm installed in the bank branch at the address “____________”

As a result of the work carried out, commissioning of the security alarm system was completed, namely:
-measuring the resistance of the alarm loop
- setting up an alarm loop
- system functionality check

With the signing of this act, commissioning work is considered completed, established technical means alarms that have undergone commissioning are considered ready to be presented to the acceptance committee for acceptance into operation.

Attached to the act:
1.Act of measuring the insulation resistance of alarm loops
2. List of installed control panels, IP.

Representatives:

Installation and commissioning organization _______________________

ACT for measuring the insulation resistance of electrical wiring

"_____"___________ 20___

Commission consisting of representatives:
Customer - "___________"
installation and commissioning (commissioning) "____________"
carried out measurements of the insulation resistance of alarm loops.

Data control devices:

Test data:

Marking of wire (cable) according to the drawingWire brand and cross-section (cable)Insulation resistance (mOhm)Note
ShS1KSPV 4x0.5710
ShS2KSPV 4x0.5700
ShS3KSPV 4x0.5695
ShS4KSPV 4x0.5685
ShS5KSPV 4x0.5705
ShS6KSPV 4x0.5680
ShS7KSPV 4x0.5710
ShS8KSPV 4x0.5715
ShS9KSPV 4x0.5720
ShS10KSPV 4x0.5635
ShS11KSPV 4x0.5730

Commission conclusion: The insulation resistance of the listed electrical wiring meets the technical requirements.

Representatives:
Customer _________________________________
Installation organization _________________________________

LIST of mounted receiving and control devices, alarm and trigger devices, detectors, annunciators, fire safety equipment.

Object: bank branch at the address “____________”

according to project 04/22/08 OS

Passed by: Representative of the installation and commissioning organization ______________

Accepted by: Representative of the “Customer” _______________

Certificate of acceptance control

"_____"___________ 20___

Installation organization "___________"

Object: bank branch at the address “____________”

Commission consisting of representatives:
Customer - "___________"
installation organization "____________"

I have drawn up this act stating that the technical means:

those that have passed the entrance control comply with the technical documentation of the manufacturing enterprises.

Representatives:
Customer _____________________
Installation organization _____________________

© 2010-2020. All rights reserved.
The materials presented on the site are for informational purposes only and cannot be used as guidance documents.

Document section: Sample documents, Act


ACCEPTANCE ACT FOR AUTOMATIC FIRE ALARM INSTALLATION

___________________________________________________________________ (name of the installation) installed in _________________________________________________ (name of the building, premises, structure) included in the _________________________________________________ (name of the energy enterprise, its queue, start-up complex) Gor. _____________________________ "__" __________________ 199_ Commission appointed ____________________________________________________ ___________________________________________________________________ (name of the customer organization that appointed the commission) By Order dated "__" _______ 199_ N _______ consisting of: Chairman _____________________________________________________ (full name, position) members of the commission ___________________________________________________ (full name, position) of representatives of the involved organizations __________________________ ___________________________________________________________________ (full name, position, organization) inspected the installation and checked the installation and adjustment work performed by ________________________________________________ (name of the installation, adjustment organization) and drew up this report about the following: 1. The installation completed with installation and commissioning was presented for acceptance: ___________________________________________________________________ (list of installed equipment and its brief ___________________________________________________________________ technical specifications) 2. Installation and adjustment work was carried out according to the project _________ __________________________________________________________________ (name design organization, numbers of drawings __________________________________________________________________ and the date of their preparation) 3. Start date of installation and adjustment work ___________________ 4. Completion date of installation and adjustment work ________________ 5. The commission carried out the following additional tests and testing of the installation (except for the tests and testing recorded in executive documentation, presented by the general contractor): ___________________________________________________________________ 6. Any deficiencies in the installation presented for acceptance that do not prevent testing are subject to elimination by the organization within the time period specified in Appendix N ___________________________________ 7. List of acceptance documentation attached to the act: ___________________________________________________________________

Commission decision

The installation and commissioning work of the presented installation was carried out in accordance with the project, standards, building codes and rules, current technical specifications and meet the requirements for its acceptance for testing. The AUPS submitted for acceptance, specified in clause 1 of this Act, shall be considered accepted since ________________ 199_ for testing ___________________________________________________ with an assessment of the quality of the work performed ___________________________________ (good, excellent, ___________________________________________________________________ satisfactory)

Chairman of the commission ________________________ (signature) Representatives of involved organizations ___________________________________ (signatures)

Passed by: Accepted by: representatives of the general representatives of the customer, contractor and subcontractor organizations __________________________ _______________________ (signatures) (signatures)

Conclusion based on the results of testing the installation

The installation specified in clause 1 of this act was tested _________________________________________________________ from “__” ___________ 199_ to “__” ___________ 199_ for ____________ hours, days in accordance with the procedure established by the customer. The installation that has been tested, ____________________________ shall be considered ready for operation and accepted with "__" __________199_ with an assessment of the quality of the installation and adjustment work performed at ______________________________________________________________ (excellent, good, satisfactory) Defects identified during the testing process that do not interfere with the operation of the facility must be eliminated organizations within the time limits specified in Appendix No. __________ to this act.

Chairman of the commission ________________________ (signature) Members of the commission _________________________________ (signatures) Representatives of involved organizations ___________________________________ (signatures)

Save this page.

ACCEPTANCE ACT FOR AUTOMATIC FIRE ALARM INSTALLATION

___________________________________________________________________ (name of the installation) installed in _________________________________________________ (name of the building, premises, structure) included in the _________________________________________________ (name of the energy enterprise, its queue, start-up complex) Gor. _____________________________ "__" __________________ 199_ Commission appointed ____________________________________________________ ___________________________________________________________________ (name of the customer organization that appointed the commission) By Order dated "__" _______ 199_ N _______ consisting of: Chairman _____________________________________________________ (full name, position) members of the commission ___________________________________________________ (full name, position) of representatives of the involved organizations __________________________ ___________________________________________________________________ (full name, position, organization) inspected the installation and checked the installation and adjustment work performed by ________________________________________________ (name of the installation, adjustment organization) and drew up this report about the following: 1. The installation completed with installation and adjustment was presented for acceptance: ___________________________________________________________________ (list of installed equipment and its brief ___________________________________________________________________ technical characteristics) 2. Installation and adjustment work was carried out according to the project _________ ___________________________________________________________________ (name of the design organization, drawing numbers ___________________________________________________________________ and the date of their preparation) 3. Start date of installation and adjustment work ___________________ 4. Completion date of installation and adjustment work ________________ 5. The commission carried out the following additional tests and testing of the installation (except for the tests and testing recorded in the as-built documentation presented by the general contractor): ___________________________________________________________________ 6. Existing deficiencies in the presented for acceptance of the installation, which do not interfere with testing, are subject to elimination by the organization within the time period specified in Appendix N ___________________________________ 7. List of acceptance documentation attached to the act: ___________________________________________________________________

Commission decision

The installation and commissioning of the presented installation was carried out in accordance with the project, standards, building codes and regulations, current technical specifications and meets the requirements for its acceptance for testing. The AUPS submitted for acceptance, specified in clause 1 of this Act, shall be considered accepted since ________________ 199_ for testing ___________________________________________________ with an assessment of the quality of the work performed ___________________________________ (good, excellent, ___________________________________________________________________ satisfactory)

Chairman of the commission ________________________ (signature) Representatives of involved organizations ___________________________________ (signatures)

Passed by: Accepted by: representatives of the general representatives of the customer, contractor and subcontractor organizations __________________________ _______________________ (signatures) (signatures)

Conclusion based on the results of testing the installation

The installation specified in clause 1 of this act was tested _________________________________________________________ from “__” ___________ 199_ to “__” ___________ 199_ for ____________ hours, days in accordance with the procedure established by the customer. The installation that has been tested, ____________________________ shall be considered ready for operation and accepted with "__" __________199_ with an assessment of the quality of the installation and adjustment work performed at ______________________________________________________________ (excellent, good, satisfactory) Defects identified during the testing process that do not interfere with the operation of the facility must be eliminated organizations within the time limits specified in Appendix No. __________ to this act.

Chairman of the commission ________________________ (signature) Members of the commission _________________________________ (signatures) Representatives of involved organizations ___________________________________ (signatures)

Regulatory documentation -> Manual for the governing document RD 78.145-93 of the Ministry of Internal Affairs of Russia. Security, fire and security-fire alarm systems and complexes. Rules for production and acceptance of work ->

16. ACCEPTANCE OF TECHNICAL SIGNALING MEANS FOR OPERATION

16.1. To accept the installed technical signaling equipment into operation, a working commission is appointed by order of the head of the customer’s organization (enterprises).

The procedure and duration of the work of the working commission is determined by the customer in accordance with SNiP 3.01.04-87 and RD78.145-93.

16.2. The working commission includes representatives of:

organization (enterprise) - customer (chairman of the commission);

installation and commissioning organization; commissioning organization: security departments;

state fire supervision authorities.

If necessary, other specialists may be involved.

16.3. The commission must begin work on acceptance no later than three days (not counting general weekends and holidays) from the date of notification by the installation and commissioning organization about the readiness of technical equipment for delivery.

16.4. When accepting technical equipment into operation, the installation and commissioning organization must present to the working commission: as-built documentation (a set of working drawings with changes made to them); technical documentation of manufacturing enterprises; certificates, technical passports or other documents certifying the quality of materials, products and equipment used in installation work; inspection report (Appendix 1);

act of transfer of equipment, products and materials for installation (according to the form of the State Statistics Committee of the Russian Federation);

act of readiness of buildings and structures for installation work (Appendix 2);

act on incoming inspection (Appendix 3);

certificate of completion of installation work (Appendix 5);

certificate of testing of protective pipelines with separation seals for leaks (Appendix 8);

act of measuring the insulation resistance of electrical wiring (Appendix 9);

certificate of inspection of hidden work on laying electrical wiring on walls, ceilings, and floors (Appendix 10);

certificate of inspection of hidden works (sewage) (Appendix 11);

certificate of inspection of hidden work (laying cable lines in the ground) (Appendix 12);

protocol for warming up cables on drums (Appendix 13);

certificate of completion of commissioning work (Appendix 14);

list of installed devices and detectors (Appendix 16).

NOTES

1. When handing over and accepting into operation technical signaling equipment at sites where installation work was carried out according to inspection reports, technical documentation of the manufacturing enterprises is presented, as well as documents in accordance with Appendices 1,3,9,10 14,16 and the equipment transfer certificate , products and materials for installation according to the form of the State Statistics Committee of the Russian Federation.

2. An act of transfer of equipment products and materials for installation (form of the State Statistics Committee of the Russian Federation) is presented if the installation and commissioning organization accepts signaling equipment for installation from the customer.

3. A certificate of completion of installation work is submitted if installation organization performed only the installation of technical alarm systems.

4. Acts in accordance with Appendices 11 and 12 of this manual are submitted if the installation and commissioning organization carried out work on laying lines in the sewer and ground

A protocol for warming up cables on reels is presented in the case when, when unwinding the cable during negative temperatures it was warmed up.

16.5. Acceptance into operation of installed technical signaling equipment without carrying out comprehensive adjustment (comprehensive testing) is not allowed.

16.6. Upon acceptance for commissioning of completed installation work and adjustment of technical signaling equipment, the working commission carries out:

quality control and compliance of completed installation and adjustment work project documentation(inspection report), technological maps and technical documentation of manufacturing enterprises;

checking the condition of engineering and technical equipment for equipping the perimeter of the facility and means of strengthening security;

measurement of the insulation resistance of the alarm loop, which must be at least 1 MOhm;

measuring the resistance of the alarm loop;

testing the performance of installed control panels, control panels and detectors.

The commission, if necessary, carries out other checks and measurements of parameters specified in the technical conditions for the installed equipment.

16.7. The test methodology for commissioning installed technical signaling equipment is determined admissions committee in accordance with technical documentation manufacturing enterprises.

16.8. If individual non-compliances of the work performed with the design documentation or the inspection report are detected, as well as the requirements of RD 78.145-93 “Security, fire and safety systems and complexes” security and fire alarm system. Rules for the production and acceptance of work”, the commission must draw up a report on the identified deviations, indicating the organizations responsible for their elimination. These organizations must eliminate the inconsistencies within 10 days, and the installation organization must again present the technical signaling equipment for delivery.

16.9. Installed technical alarm systems are considered accepted for operation if the inspection establishes:

installation and adjustment work was carried out in accordance with the requirements of these rules, technological maps and technical documentation of manufacturing enterprises;

all elements building structures and protected areas of the facility are blocked according to the project or inspection report; all zones around the perimeter of the facility are blocked according to the project or inspection report;

measurement results are within normal limits;

tests of the performance of technical means gave positive results, while fire alarm technical means must, in cases provided for by the design, ensure the shutdown of ventilation systems, the inclusion of smoke removal systems and air pressure in staircases and vestibules in case of fire.

16.10. Installed PTUs are considered accepted for operation if the following conditions are met:

while ensuring high-quality television images on the screen of a video monitoring device (VCU);

total nonlinear distortion images should not exceed ±10%;

total geometric distortions of the image should not exceed ±4%;

The nominal size of the image on the VKU screen should be (394< 308) ±2 мм;

operator-free operation must be ensured, i.e. saving the image of the observed object, with interlaced image decomposition into 625 lines at 25 frames per second, under the influence of all destabilizing factors specified by the technical conditions for the installation;

the horizontal resolution of the installation, assessed by the vertical wedge of the image of the IT-72 test table on the VKU screen with table illumination of 200 lux and a relative lens aperture of 1:4, ensures the visibility of at least 500 television lines and at least 450 lines in the corners;

installations must provide the ability to operate television cameras with lenses;

After turning on the unit, the image should appear on the VKU screen no more than 2 minutes later.

16.11. The performance of security lighting is determined based on the test results lighting network for correct ignition and combustion of lamps.